Border Fencing
BORDER FENCING

Engineering Trusted Defences for India’s Borders

Kram Infracon plays a vital role in strengthening national security through high-quality border fencing and associated civil works. With precision engineering, durable materials, and timely project delivery, we help create secure, reliable barriers that support the nation’s safety and strategic infrastructure needs.

Projects

Project: Construction of Border Fencing and Road along the Indo–Bangladesh Border in Mizoram, covering multiple stretches between BP No. 2350 to BP No. 2364 (Total Combined Length: 57.58 km+)

Client:

Scope of Work: Execution of new-design border security fencing and associated border roads across critical terrain in the state of Mizoram.
This includes:

Package–I: BP No. 2350 to BP No. 2353 (22 km)

Package–III: BP No. 2355/28S to BP No. 2359/41S (New Parva) – 35.58 km

Package–IV: BP No. 2359/41S (New Parva) to BP No. 2364 (Tri-Pillar) – (Length as per project allocation)

Work involves construction of fencing, border roads, ground works, and provision of secure, durable barriers across hilly and challenging terrain under EPC execution mode.

Key Features:

  • Over 57 km of new border fencing and all-weather border road
  • Strengthened security infrastructure along sensitive Mizoram–Bangladesh border
  • Includes roadworks, foundation works & fencing in complex hill terrain
  • High-durability fencing designed for long-term security performance
  • Precision engineering in remote border stretches with strict security standards

Current Status: Ongoing

Project: Conversion of Phase II/III Border Security Fencing to New-Design Fence along the Indo–Bangladesh Border in West Bengal between BP No. 243/MP to 764/2-S (Total Length: 210.028 km)

Client: 

Scope of Work: Upgradation and conversion of existing Phase II/III border fencing to new-design security fencing across multiple critical stretches in the districts of Uttar Dinajpur, Darjeeling, and Jalpaiguri. The project includes Package-I (36.26 km), Package-II (36.19 km), Package-IV (27.709 km), and Package-V (27.447 km), covering intermediate BOPs, riverine structures (bridges & culverts), fencing gaps, and excluded old-fence stretches under EPC Mode–III.

Key Features:

  • Total 127+ km (combined packages) of upgraded new-design fencing
  • Coverage of high-sensitivity Indo–Bangladesh Border zones
  • Includes riverine structures, culverts & intermediate BOP connectivity
  • Strengthening of border security infrastructure across three districts
  • Precision execution ensuring long-term durability & enhanced protection

Current Status: Ongoing

Project: Replacement of old/damaged Border Security Fence with new-design fencing along the Indo–Pakistan Border in Punjab Sector (Total Length: 134.561 km)

Client: 

Scope of Work: Replacement of existing damaged border fencing with upgraded, new-design security fencing across multiple locations under the Amritsar Sector (44.225 km) and Gurdaspur Sector (21.225 km) on Engineering, Procurement and Construction (EPC) Mode–III.

Key Features:

  • Total 134.561 km of enhanced security fencing
  • Upgraded new-design fence for higher durability & protection
  • Executed across high-sensitivity border zones
  • Precision civil works with strict compliance to security standards
  • Strengthened border infrastructure for long-term reliability

Current Status: Ongoing

Demo Title

Demo Description


My first Popup

This will close in 20 seconds