Roads and Bridges
Projects
Project : Construction of Dohrighat Bypass on Varanasi Gorakhpur section of NH-29 in the State of Uttar Pradesh
Client : National Highways Authority of India (NHAI).
Scope of Work: Construction of Dohrighat Bypass (6 km) on Varanasi Gorakhpur section of NH-29 in the State of Uttar Pradesh on Engineering, Procurement and Construction (EPC) mode.
Key Features:
- 6 Km – 4 Lane Greenfield Bypass with Rigid Pavement
- 1 Flyover
- 10 Culverts
- 5 Minor Bridges
Major Quantities:
- Concrete: 0.7 Lakhs Cum
- Reinforcement Steel : 1500 MT
- Earthwork: 10 Lakh Cum
Current Status : Completed in July 2020
Project : Widening and Upgrading of Aizawl-Tuipang Section of NH-54 in the State of Mizoram.
Client : National Highways & Infrastructural Development Construction Limited
Scope of Work: Widening and upgrading to 2 lanes of 50.90 km. stretch of Aizawl-Tuipang Section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode.
Key Features:
- 50.9 Km, Flexible Pavement
- 233 Culverts
Major Quantities:
- Concrete: 0.4 Lakhs Cum
- Reinforcement Steel : 600 MT
- Earthwork: 13 Lakh Cum
Current Status : Project Under Implementation
Project : Widening and Up-gradation of Porsa-Ater-Bhind section of NH-552 in the State of Madhya Pradesh
Client : Ministry of Road Transport & Highways (MORTH)
Scope of Work: Rehabilitation & Up gradation of Porsa-Ater-Bhind Road and Conventional White topping on Porsa to Bhind section for a total length of 55.25 km on NH-552 Ext. in the State of Madhya Pradeshon Engineering, Procurement and Construction (EPC) mode.
Key Features:
- 55.25 Km, Flexible Pavement
- 1 Major Bridge of ~300 Mtrs. Length
- 5 Minor Bridges
- 64 Culverts
- 1 Toll Plaza
Major Quantities:
- Concrete: 0.8 Lakh Cum
- Reinforcement Steel: 1000 MT
- Earthwork: 5 Lakh Cum
Current Status : Commissioned in March 2021
Project : Construction of Ghosi Bypass on Varanasi Gorakhpur section of NH-29 in the state of Uttar Pradesh.
Client : National Highways Authority of India (NHAI).
Scope of Work: Construction of Ghosi Bypass (8.7 km) on Varanasi Gorakhpur section of NH-29 in the state of Uttar Pradesh on Engineering, Procurement and Construction (EPC) mode.
Key Features:
- 8.7 Km – 4 Lane Greenfield Bypass with Rigid Pavement
- 2 underpasses
- 26 Culverts
- 3 Minor Bridges
Major Quantities:
- Concrete: 0.9 Lakh Cum
- Reinforcement Steel: 1000 MT
- Earthwork: 8 Lakh Cum
Current Status :Completed in July 2020
Project : Construction of Chhiahtlang and Serchhip bypass on Aizawl-Tuipang section of NH-54 in Mizoram
Client : National Highways & Infrastructural Development Construction Limited
Scope of Work: Construction of Chhiahtlang and Serchhip Bypass (14.4 km) on Aizawl-Tuipang section of NH-54 in the state of Mizoram on Engineering, Procurement and Construction (EPC) mode
Key Features:
- 14.4 Km, Flexible Pavement, Greenfield project
- 1 Major Bridge – 150 Meters
- 1 Minor Bridges
- 83 Culverts
Major Quantities:
- Concrete: 0.7 Lakh Cum
- Reinforcement Steel: 2000 MT
- Earthwork: 11 Lakh Cum
Current Status : Project Under Implementation
Project : Construction of Four lane highway on Bijupara-Kuru section of NH-75 in the State of Jharkhand.
Client : National Highways Authority of India (NHAI).
Scope of Work: The major scope of work on the project included 4-Laning of part of Bijupara-Kuru section of NH-75 in the State of Jharkhand for a total length of 21Kms on Engineering, Procurement and Construction (EPC) mode.
Key Features:
- 4 Lane, Rigid Pavement
- 3 Minor Bridges
- 26 Culverts
Major Quantities:
- Concrete: 2 Lakhs Cum
- Reinforcement Steel : 2800 MT
- Earthwork: 3 Lakhs Cum
Current Status : Project Commissioned in September 2019